1
/
of
4
Uploader
Komatsu WA1200-3 Wheel Loader Service Manual Workshop Guide
Komatsu WA1200-3 Wheel Loader Service Manual Workshop Guide
Regular price
$58.50 USD
Regular price
Sale price
$58.50 USD
Taxes included.
Shipping calculated at checkout.
Quantity
.
In Stock
Couldn't load pickup availability
Format : PDF
SUPPLIED AS DOWNLOADABLE LINK
Manual Included:
Shop Manual:
2398 pages
Field Instructions Manual:
229 pages
Specifications:
Brand:
Komatsu
Model:
WA1200-3
Type:
Loader
Serial Number:
50001 and up
Manuals:
Shop Manual and Field Instructions Manual
Publication Number:
SEBM018225 and GEN00011-04
Language:
English
Format:
PDF
Description
Table of Contents
01 GENERAL ……………………………………………………………… 01-1
10 STRUCTURE AND FUNCTION ……………………………….. 10-1
20 TESTING AND ADJUSTING…………………………………… 20-1
30 DISASSEMBLY AND ASSEMBLY …………………………… 30-1
40 MAINTENANCE STANDARD………………………………….. 40-1
90 OTHERS………………………………………………………………… 90-1
Removal and installation of switching pump assembly
– When removing the switching pump assembly from the machine, prepare the following KIT parts since consumable parts such as hoses and O-rings must be replaced with new ones when installing the assembly.
Removal
– Before starting the removal work, be sure to perform the works described in "2. Preparatory work" and "3. Precautions during work" of "00-3 Safety notice."
1. Drain the hydraulic oil.
Hydraulic oil: Approx. 1,125
2. Open the upper step cover.
3. Disconnect hoses (1) and (2).
4. Disconnect hoses (3) and (4).
5. Remove U-bolt (5) and disconnect suction tube (6).
6. Disconnect hose (7).
7. Disconnect hoses (8) and (9).
8. Sling switching pump assembly (10), remove its mounting bolts, and lift it off.
[*1] 4 Switching pump assembly: 190 kg
SUPPLIED AS DOWNLOADABLE LINK
Manual Included:
Shop Manual:
2398 pages
Field Instructions Manual:
229 pages
Specifications:
Brand:
Komatsu
Model:
WA1200-3
Type:
Loader
Serial Number:
50001 and up
Manuals:
Shop Manual and Field Instructions Manual
Publication Number:
SEBM018225 and GEN00011-04
Language:
English
Format:
Description
Table of Contents
01 GENERAL ……………………………………………………………… 01-1
10 STRUCTURE AND FUNCTION ……………………………….. 10-1
20 TESTING AND ADJUSTING…………………………………… 20-1
30 DISASSEMBLY AND ASSEMBLY …………………………… 30-1
40 MAINTENANCE STANDARD………………………………….. 40-1
90 OTHERS………………………………………………………………… 90-1
Removal and installation of switching pump assembly
– When removing the switching pump assembly from the machine, prepare the following KIT parts since consumable parts such as hoses and O-rings must be replaced with new ones when installing the assembly.
Removal
– Before starting the removal work, be sure to perform the works described in "2. Preparatory work" and "3. Precautions during work" of "00-3 Safety notice."
1. Drain the hydraulic oil.
Hydraulic oil: Approx. 1,125
2. Open the upper step cover.
3. Disconnect hoses (1) and (2).
4. Disconnect hoses (3) and (4).
5. Remove U-bolt (5) and disconnect suction tube (6).
6. Disconnect hose (7).
7. Disconnect hoses (8) and (9).
8. Sling switching pump assembly (10), remove its mounting bolts, and lift it off.
[*1] 4 Switching pump assembly: 190 kg
Share
