Skip to product information
1 of 4

ManualBull

JCB 8052 8060 Mini Excavator Factory Workshop Service Manual 9803/9290

JCB 8052 8060 Mini Excavator Factory Workshop Service Manual 9803/9290

Regular price $19.99 USD
Regular price Sale price $19.99 USD
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity
.
In Stock

JCB 8052 8060 Mini Excavator Factory Workshop Service Manual 9803/9290
======================================================================

TECHNICAL SPECIFICATIONS:
----------------------------------------
Size: 32.12 MB
Pages: 297
Format: PDF
Language: English
Brand: JCB

CONTENTS (Table of Contents):
----------------------------------------
training by JCB Technical Training Department.
1 = General Information - includes torque settings and service tools
2 = Care & Safety - includes warnings and cautions pertinent to aspects of workshop procedures etc.
3 = Routine Maintenance - includes service schedules and recommended lubricants for the
machine.
A = Optional EquipmentB = Body & Framework ... etc.
for rapid reference.
generally can be reversed for assembly.
for dry threads, hence for lubricated threads may be reduced by one third.
Identification
Storing your machine 1 - 2Preparation after Storage
TOPS and FOGS
Operation
Opening the side window
Track controls 3 - 3Engine controls 3 - 4Switches 3 - 5Instruments
Dozer controls 4 - 1Excavator controls
Changing the Control Pattern (ISO/SAE)
Slew cab 4 - 4Swing boom 4 - 5Raise / Lower boom 4 - 6Dipper 4 - 7Bucket
ii ii
Using the attachments and site safety
Moving a disabled machine 10 - 1Transporting the machine
Preparing the transporter for loading
Loading onto the transporter 10 - 3Securing the machine
Unloading the machine
Service Tools
Sealing and Retaining Compounds
Preparation for Storage
The operations to place a machine into storage (-15°C
to 44° C) are given below.
1Park the machine safely with the bucket and dipper
rams retracted and the dig end outstretched. Lowerthe boom until the bucket rests on the ground.
Lower the dozer to the ground.
2Switch off the engine. Operate controls to releasepressure from the rams.
3Disconnect battery to prevent discharge.
4Ensure the fuel tank is filled to a maximum, leavingno air space.
5Ensure hydraulic tank is filled to maximum on thesight gauge.
6Spray exposed ram rods with Waxoyl.
7Slacken off rubber tracks until no visible springtension exists.Preparation after Storage
The operations to remove a machine from storage (-
15°C to 44°C) and prepare it for use are given below.
1Lower the fuel level to ensure that sufficient air space
exists in the tank.
correct levels as necessary.
3Ensure the battery is fully charged.
4Reconnect battery.
5Remove electrical contact from fuel injection pumpsolenoid.
6Crank engine for 15 seconds or until oil pressurewarning light goes out.
7Reconnect electrical supply to the fuel injection pumpsolenoid.
8Start the engine. If the engine fails to start afterseveral attempts, bleed the fuel system.
9Adjust track tensions.
10Grease all lubrication points.1 -

PLEASE NOTE:
----------------------------------------
This is a digital manual - no physical copy will be shipped.
The manual is available for immediate download after purchase.

View full details