Skip to product information
1 of 4

Uploader

Case Farmall 75N, 85N, 95N, 105N, 105V Tractor Service Manual Workshop Guide

Case Farmall 75N, 85N, 95N, 105N, 105V Tractor Service Manual Workshop Guide

Regular price $64.50 USD
Regular price Sale price $64.50 USD
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity
.
In Stock
Format : PDF
SUPPLIED AS DOWNLOADABLE LINK

Manual Included:

Service Manual:
1668 pages and 2545 pages
Specifications:

Brand:
Case

Model:
75N with cab PIN Z8)F19102 – ZCJF 10907
75N with cab PIN ZCJF06107 and above
75N without cab PIN Z9FO1865 -ZCF07697
75N without cab PIN ZCJF07813 and above
85N with cob PIN ZB)F1 7086 – ZCJF09425
85N with cab PIN ZCJF08828 and above
85N without cab PIN Z9)F01936 – ZCIF 10868
85N without cab PIN ZCIF16077 and above
95N with cab PIN Z9)F00469 -ZCJF 10732
95N with cab PIN ZCJF13045 and above
95N without cab PIN Z9)F01090 – ZCJF05141
95N without cab PIN ZCJF 15989 and above
105N with cab PIN ZBIF20417 and above
105N without cab PIN ZCjF16900 and above
105V with cab PIN ZBIF20562 and above
105V without cab PIN ZD/F09419 and above

Type:
Tractor

Manuals:
Service Manual

Publication Numbers:
47888397 (July 2016) & 84241675

Language:
English

Format:
PDF

Description
Table of Content (
Service Manual)
Introduction
Engine
Clutch
Transmission
Four Wheel Drive
Front Axle
Rear Axle
Power Take Off
Brake and Controls
Hydraulic Systems
Hitches, Drawbars and implement couplings
Steering
wheels
Cab climate control
Electrical System
Platform, cab, bodywork and decals
Special Tools
Manual Extract:
Remote control valve – Install
Refit the auxiliary control valves and the trailer brake valve as described here:
• Fit the control valves together with the bracket and lock the bolts securing the bracket to the engine.
• Connect the control valve tie rods.
• Refit the two hydraulic hoses connected to the control valves.
• Fit the trailer brake valve and lock it with the two retaining bolts.
• Disconnect the six pipes connected to the trailer brake valve.
• Check the oil level and top up if necessary.
• Connect the battery negative lead.
• With the engine running, carry out a few operations using the controls of the control valves and check there is no leakage from the pipes.
View full details