{"product_id":"komatsu-d61exi-23-d61pxi-23-dozer-service-manual-workshop-guide","title":"Komatsu D61EXi-23, D61PXi-23 Dozer Service Manual Workshop Guide","description":"Format : PDF\u003cbr\u003eSUPPLIED AS DOWNLOADABLE LINK\u003cbr\u003e\u003cbr\u003eManual Included:\u003cbr\u003eShop Manual:\u003cbr\u003e1939 pages\u003cbr\u003eOperation and Maintenance Manual:\u003cbr\u003e163 pages\u003cbr\u003eSpecifications:\u003cbr\u003eBrand:\u003cbr\u003eKomatsu\u003cbr\u003eModel:\u003cbr\u003eD61EXi-23, D61PXi-23\u003cbr\u003eType:\u003cbr\u003eDozer\u003cbr\u003eSerial Number:\u003cbr\u003e30324 and up\u003cbr\u003eManuals:\u003cbr\u003eShop Manual and Operation and Maintenance Manual\u003cbr\u003ePublication Numbers:\u003cbr\u003eSEN06256-01 and TEN00616-04\u003cbr\u003eLanguage:\u003cbr\u003eEnglish\u003cbr\u003eFormat:\u003cbr\u003ePDF\u003cbr\u003e\u003cbr\u003eDescription\u003cbr\u003eTable of Contents\u003cbr\u003eIndex and foreword\u003cbr\u003eSpecification\u003cbr\u003eStructure, function and maintenance standard\u003cbr\u003eStandard value table\u003cbr\u003eTesting and adjusting\u003cbr\u003eTroubleshooting\u003cbr\u003eDisassembly and assembly\u003cbr\u003eMaintenance Standard\u003cbr\u003eAppendix\u003cbr\u003eDiagrams and drawings\u003cbr\u003eIndex\u003cbr\u003eProper service and repair are extremely important for safe machine operation. The service and repair techniques recommended by Komatsu and described in this manual are both effective and safe. Some of these techniques require the use of tools specially designed by Komatsu for the specific purpose.\u003cbr\u003eOverall disassembly and assembly of track shoe assembly (Standard type track shoe)\u003cbr\u003eThis section of the manual describes the lubricated track.\u003cbr\u003e1. Place the track shoe assembly on a flat floor with the shoes facing up. Remove the track shoe bolt from the master link and remove the shoe.\u003cbr\u003eLoosen master link bolts without using an impact wrench.\u003cbr\u003e2. If a half assembly (in mass and length) is too large for disassembly and assembly, divide the track shoe assembly into quarter assemblies.\u003cbr\u003e3. Sling the track shoe assembly, and place the assembly on the floor with the shoes up.\u003cbr\u003eRemove the track shoe from the regular link by using an impact wrench.\u003cbr\u003eWhen repositioning the track shoe assembly, be careful not to damage the master links.\u003cbr\u003eIf the shoe nut needs to be removed by gas cut, keep the temperature in the seal section below 80°C to prevent thermal deterioration of the seals. Take measures to prevent the spatters from entering through the clearances between the links.\u003cbr\u003e4. Draining oil\u003cbr\u003eBefore disassembling the link assembly, drain oil from inside the pin to prevent the link press being smeared with oil.\u003cbr\u003eIf it is decided that the track should be rebuilt as a dry type track before starting the disassembly, the following work is not necessary to perform.\u003cbr\u003e1) Place the link assembly on a flat floor with the large plug side facing up and chamfer the pin end to remove burrs by using a grinder, etc.\u003cbr\u003eIf the track shoe is disassembled with burrs remaining on the pin end faces, the pin press-fitting hole in the link will be damaged and result in oil leaks from the press-fitting portion after the track is rebuilt.","brand":"Uploader","offers":[{"title":"Default Title","offer_id":53602096415051,"sku":null,"price":60.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0978\/2519\/4315\/files\/1-8_387d301d-dc13-4ece-9a2e-1bc1378464c2.png?v=1760447824","url":"https:\/\/manualbull.com\/products\/komatsu-d61exi-23-d61pxi-23-dozer-service-manual-workshop-guide","provider":"ManualBull","version":"1.0","type":"link"}