{"product_id":"doosan-dx235lcr-excavator-service-manual-workshop-guide","title":"Doosan DX235LCR Excavator Service Manual Workshop Guide","description":"Format : PDF\u003cbr\u003eSUPPLIED AS DOWNLOADABLE LINK\u003cbr\u003e\u003cbr\u003eManual Included:\u003cbr\u003eShop Manual:\u003cbr\u003e784 Pages\u003cbr\u003eSpecifications:\u003cbr\u003eBrand:\u003cbr\u003eDoosan Excavator\u003cbr\u003eModel:\u003cbr\u003eDX235LCR\u003cbr\u003eSerial Number:\u003cbr\u003e5001 and Up\u003cbr\u003eType:\u003cbr\u003eExcavator\u003cbr\u003eManuals:\u003cbr\u003eShop Manual\u003cbr\u003ePublication Number:\u003cbr\u003e950106-00081E\u003cbr\u003eLanguage:\u003cbr\u003eEnglish\u003cbr\u003eFormat:\u003cbr\u003ePDF\u003cbr\u003e\u003cbr\u003eDescription\u003cbr\u003eTable of Contents:-\u003cbr\u003eSafety\u003cbr\u003eTrack Excavator Safety………………………………………………………………. SP002112\u003cbr\u003eSpecifications\u003cbr\u003eSpecification for DX235LCR……………………………………………………….. SP002113\u003cbr\u003eGeneral Maintenance\u003cbr\u003eGeneral Maintenance Procedures……………………………………………….. SP000016\u003cbr\u003eStandard Torques……………………………………………………………………… SP000813\u003cbr\u003eUpper Structure\u003cbr\u003eCabin ………………………………………………………………………………………. SP001938\u003cbr\u003eCounterweight…………………………………………………………………………… SP002114\u003cbr\u003eFuel Tank…………………………………………………………………………………. SP002115\u003cbr\u003eFuel Transfer Pump…………………………………………………………………… SP000021\u003cbr\u003eSwing Bearing…………………………………………………………………………… SP000022\u003cbr\u003eLower Structure and\u003cbr\u003eChassis\u003cbr\u003eTrack Assembly ………………………………………………………………………… SP002116\u003cbr\u003eEngine and Drive Train\u003cbr\u003eDrive Coupling (Main Pump)……………………………………………………….. SP002117\u003cbr\u003eHydraulics\u003cbr\u003eHydraulic System Troubleshooting, Testing and Adjustment …………… SP002118\u003cbr\u003eAccumulator……………………………………………………………………………… SP000028\u003cbr\u003eCenter Joint (Swivel)………………………………………………………………….. SP001620\u003cbr\u003eCylinders………………………………………………………………………………….. SP002119\u003cbr\u003eSwing Device……………………………………………………………………………. SP002120\u003cbr\u003eTravel Motor……………………………………………………………………………… SP001621\u003cbr\u003eMain Pump and PTO …………………………………………………………………. SP000988\u003cbr\u003eGear Pump ………………………………………………………………………………. SP000931\u003cbr\u003eMain Control Valve ……………………………………………………………………. SP001024\u003cbr\u003eRemote Control Valve (Work Lever \/ Joystick) ………………………………. SP000069\u003cbr\u003eTravel Control Valve (with Damper)……………………………………………… SP002130\u003cbr\u003eSolenoid Valve Assembly …………………………………………………………… SP001944\u003cbr\u003eBreaker EPPR Valve (Opt) …………………………………………………………. SP000192\u003cbr\u003eHydraulic Schematic (DX235LCR) ………………………………………………. SP002121\u003cbr\u003eElectrical System\u003cbr\u003eElectrical System ………………………………………………………………………. SP002122\u003cbr\u003eElectrical Schematic (DX235LCR)……………………………………………….. SP002123\u003cbr\u003eAttachments\u003cbr\u003eBoom and Arm………………………………………………………………………….. SP002124\u003cbr\u003eBucket……………………………………………………………………………………… SP000939\u003cbr\u003eDoosan DX235LCR Manual Instruction Extract:\u003cbr\u003eArm Installation Procedure\u003cbr\u003eReattach the base of the arm cylinder to the mounting point on top of the boom.\u003cbr\u003eBegin with the arm securely supported on blocking in front of the excavator. Pregrease the mounting pin for the rod end of the arm cylinder and push it through the ears on the end of the arm.\u003cbr\u003eAttach a sling around that mounting pin and lift the arm with an assist crane until it is in position for the boom-arm pin connection to be made.\u003cbr\u003eRelieve hydraulic pressure from all points of the system before any hydraulic lines are opened, then carefully assemble hydraulic connections to the arm cylinder.\u003cbr\u003eRemove the sling from around the rod end arm cylinder pin, withdraw the pin and lift the body of the arm cylinder to re-pin the mounting connection.\u003cbr\u003eBoom Installation Procedure\u003cbr\u003eBefore reassembling the attachment, make sure to inspect all bushings and pivot points of each section. To avoid damaging the seats, bushings should never be hammered or chiseled out of their seats.\u003cbr\u003eInstallation is otherwise a reversal of the removal procedures.\u003cbr\u003eSTART-UP PROCEDURES\u003cbr\u003eOnce the boom has been serviced, it should be lubricated as outlined in the initial start-up procedures of the operation manual. Refer\u003cbr\u003eHow to Use The Doosan DX235LCR Excavator Guide Manual:\u003cbr\u003eThis manual provides information for servicing the DX235LCR Doosan Excavator. All service procedures are broken down into detailed steps, listed in their recommended sequence. The manual uses both photographs and drawings to help locate and itemize components. The table of Contents on the preceding pages is your best tool for finding the service procedure you need. Be certain to observe all Safety information included in these pages.\u003cbr\u003eA schematic of each of the major engine systems is provided at the beginning of the section of the manual devoted to troubleshooting and repairing that particular system.\u003cbr\u003eBasic safety precautions are list in the Safety section of the Doosan DX235LCR Excavator Service Manual. Additional safety precautions are list in the Safety section of the owner\/operation\/maintenance publication. Specific safety warnings for all these publications are provided in the description of operations where hazards exist. WARNING labels have also been put on the product to provide instructions and to identify specific hazards.","brand":"Uploader","offers":[{"title":"Default Title","offer_id":53593320849739,"sku":null,"price":60.0,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0978\/2519\/4315\/files\/1-47_02a2cdaf-6572-4da8-86c8-83a3a16ed0c6.png?v=1760374742","url":"https:\/\/manualbull.com\/products\/doosan-dx235lcr-excavator-service-manual-workshop-guide","provider":"ManualBull","version":"1.0","type":"link"}