{"product_id":"case-750m-crawler-dozer-service-manual-workshop-guide","title":"Case 750M Crawler Dozer Service Manual Workshop Guide","description":"Format : PDF\u003cbr\u003eSUPPLIED AS DOWNLOADABLE LINK\u003cbr\u003e\u003cbr\u003eManual Included:\u003cbr\u003e•\u003cbr\u003eService Manual:\u003cbr\u003e2007 Pages \u0026amp; 2011 Pages\u003cbr\u003eSpecifications:\u003cbr\u003e•\u003cbr\u003eBrand:\u003cbr\u003eNew Holland\u003cbr\u003e•\u003cbr\u003eModel:\u003cbr\u003e750M\u003cbr\u003e•\u003cbr\u003eType:\u003cbr\u003eDozer\u003cbr\u003e•\u003cbr\u003eManuals:\u003cbr\u003eService Manual\u003cbr\u003e•\u003cbr\u003ePublication Numbers:\u003cbr\u003e48080038 (April 2017) \u0026amp; 51418565 (Nov 2017)\u003cbr\u003e•\u003cbr\u003eLanguage:\u003cbr\u003eEnglish\u003cbr\u003e•\u003cbr\u003eFormat:\u003cbr\u003ePDF\u003cbr\u003e\u003cbr\u003eDescription\u003cbr\u003eTable of Contents\u003cbr\u003eContents\u003cbr\u003eIntroduction\u003cbr\u003eMaintenance\u003cbr\u003eEngine\u003cbr\u003ePower Coupling\u003cbr\u003eHydrostatic Drive\u003cbr\u003eBrakes and Controls\u003cbr\u003eHydraulic Systems\u003cbr\u003eHitches, drawbars and implement couplings\u003cbr\u003eTracks and Track Suspension\u003cbr\u003eCab Climate Control\u003cbr\u003eElectrical System\u003cbr\u003eLubrication System\u003cbr\u003eDozer Blade and arm\u003cbr\u003eTools\u003cbr\u003ePlatform, cab, bodywork and decals\u003cbr\u003eSpecials Tool Index\u003cbr\u003eElectrical Schematics\u003cbr\u003eHydraulics Schematics\u003cbr\u003eManual Extract: Track roller Lower roller – Filling\u003cbr\u003ePrior operation:\u003cbr\u003eTrack roller Lower roller – Leakage test (48.138).\u003cbr\u003e1. Turn the shaft so that the mounting surface of the end cap is down and the filler opening is up.\u003cbr\u003e2. Fill the roller with the lubricant, refer to Capacities.\u003cbr\u003e3. Connect an air line that can be controlled to a maximum pressure of 275 kPa, 2.7 bar (40 psi) to the filler hole.\u003cbr\u003e4. Open the valve for the air line to push the lubricant into the outer ends of the roller.\u003cbr\u003e5. Close the valve and disconnect the air line from the roller.\u003cbr\u003e6. Check the oil fill volume by positioning the roller so the oil fill hole is at the top of the roller.\u003cbr\u003e7. Insert a dip stick into the oil fill hole until it contacts the tip of the roller or the idler shaft.\u003cbr\u003e8. The dip stick should read an oil volume level of 5.0 to 8.0 mm (0.195 to 0.315 in) above the top of the shaft.\u003cbr\u003e9. Install and tighten the plug.","brand":"Uploader","offers":[{"title":"Default Title","offer_id":53600953729355,"sku":null,"price":62.25,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0978\/2519\/4315\/files\/1-19_77bb67ee-6223-456c-806d-a69e0e8d47d3.png?v=1760438327","url":"https:\/\/manualbull.com\/products\/case-750m-crawler-dozer-service-manual-workshop-guide","provider":"ManualBull","version":"1.0","type":"link"}