{"product_id":"case-650m-crawler-dozer-service-manual-workshop-guide","title":"Case 650M Crawler Dozer Service Manual Workshop Guide","description":"Format : PDF\u003cbr\u003eSUPPLIED AS DOWNLOADABLE LINK\u003cbr\u003e\u003cbr\u003eManual Included:\u003cbr\u003e•\u003cbr\u003eService Manual:\u003cbr\u003e2046 pages\u003cbr\u003eSpecifications:\u003cbr\u003e•\u003cbr\u003eBrand:\u003cbr\u003eNew Holland\u003cbr\u003e•\u003cbr\u003eModel:\u003cbr\u003e650M\u003cbr\u003e•\u003cbr\u003eType:\u003cbr\u003eDozer\u003cbr\u003e•\u003cbr\u003eManuals:\u003cbr\u003eService Manual\u003cbr\u003e•\u003cbr\u003ePublication Numbers:\u003cbr\u003e48153338 (April 2018)\u003cbr\u003e•\u003cbr\u003eLanguage:\u003cbr\u003eEnglish\u003cbr\u003e•\u003cbr\u003eFormat:\u003cbr\u003ePDF\u003cbr\u003e\u003cbr\u003eDescription\u003cbr\u003eTable of Contents\u003cbr\u003eContents\u003cbr\u003eIntroduction\u003cbr\u003eMaintenance\u003cbr\u003eEngine\u003cbr\u003ePower Coupling\u003cbr\u003eHydrostatic Drive\u003cbr\u003eBrakes and Controls\u003cbr\u003eHydraulic Systems\u003cbr\u003eHitches, drawbars and implement couplings\u003cbr\u003eTracks and Track Suspension\u003cbr\u003eCab Climate Control\u003cbr\u003eElectrical System\u003cbr\u003eLubrication System\u003cbr\u003eDozer Blade and arm\u003cbr\u003eTools\u003cbr\u003ePlatform, cab, bodywork and decals\u003cbr\u003eSpecials Tool Index\u003cbr\u003eElectrical Schematics\u003cbr\u003eHydraulics Schematics\u003cbr\u003eManual Extract: Fuel Prefilter\u003cbr\u003e1. Open the right-hand side rear access door to locate the fuel prefilter cartridge (1).\u003cbr\u003e2. Close the fuel shut off valve (2) to prevent fuel leakage.\u003cbr\u003e3. Clean the outside of the fuel prefilter cartridge (1), fuel prefilter cartridge head (3) and remove any dirt and debris around the area that might contaminate the system.\u003cbr\u003e4. Disconnect the wire harness (4) and remove the fuel prefilter cartridge (1).\u003cbr\u003e5. Apply a thin layer of clean oil to the gasket on the new fuel prefilter cartridge (1).\u003cbr\u003e6. Install and tighten the new fuel prefilter cartridge (1) by hand. Tighten the filter 1\/2 to 3\/4 turn after the filter cartridge gasket makes contact with the prefilter head (3).\u003cbr\u003e7. Reconnect the wire harness (4).\u003cbr\u003e8. Open the fuel shut off valve (2) and check for leaks.","brand":"Uploader","offers":[{"title":"Default Title","offer_id":53600951763275,"sku":null,"price":61.5,"currency_code":"USD","in_stock":true}],"thumbnail_url":"\/\/cdn.shopify.com\/s\/files\/1\/0978\/2519\/4315\/files\/1-18_e5b1d921-bf1d-46b9-a082-04bf63db9725.png?v=1760438305","url":"https:\/\/manualbull.com\/products\/case-650m-crawler-dozer-service-manual-workshop-guide","provider":"ManualBull","version":"1.0","type":"link"}